top of page

Exterior Foundations

DRIVEWAYS
PATIOS
PORCHES

​​

  • stonework

  • pavers

  • asphalt

​

PARKING PADS
GARAGE FLOORS
FOUNDATION WORK

​​

  • stamped concrete 

  • rosette concrete

  • broom finishes

Replacements
Custom Designing

Additional Features & Professional Design Options
Gas & Water Lines           Drainage           Fire Pits    
Electrical Connections           Accents          Pillars          Coping

Scheduling your Project:

New surfaces do require time for a beautiful finish. Concrete must set & cure. Pavers & stone need to be filled and have time to settle. Timing is weather dependent.  Parking on your new driveway can resume in approximately 7 days.  We will inform our clients specifically for each project. 
 
We install french drains & replace culvert pipes in accordance to city requirements.

The permit process is handled for our clients. Depending on the city/county codes & the specific property/project, the permit process can take 1-6 weeks.

Concrete

Finishes for concrete include broom, rosette, and stamped.

We also install foundations for sheds, decks, houses, basements, and other structures where a concrete pad is required or preferred.

Stamped Patio_edited.jpg
Walkway w_ Semi-Transparent Stain_edited.jpg
100MEDIA$IMAG13191 (1).jpg

Pavers & Stonework

Synchronous Construction can design and install any pattern for driveways and patios.  Indoor stonework installation is available as well. This includes work on fireplaces and accent walls.

Photos of our work
Check out the galleries below to see the process and finished product of some of our projects!

Anchor 1

​

Fill in your information below to request a free estimate or ask questions

Your details were sent successfully!

Synchronous Construction Inc.

6100 Oak Tree Blvd, Suite 200

 Independence, OH 44131

Copyright © 2018 Synchronous Construction, All Rights Reserved

 by Synchronous Construction, Inc.

Proudly created with Wix.com

bottom of page